Phase 4 Acceptance Update

  • Date: 2026-05-13
  • Scope: pluginization path validation

What was validated

The first version of the apply/rollback flow has now been validated against a pristine extracted openclaw@2026.5.7 package.

Apply validation

The apply script successfully injected the expected PoC markers into:

  • send-sxDwUGaO.js
  • bot-Ce301bOE.js

Confirmed markers after apply included:

  • rec:continue
  • A. 繼續
  • reply-end-controls.json
  • reply-end-debug.log

Rollback validation

The rollback script successfully restored the pristine files.

Confirmed markers were gone again after rollback.

What this means

This is not yet the final pluginized architecture, but it proves that the project now has a reproducible patch application path instead of depending entirely on undocumented manual edits.

That is an important Phase 4 milestone because it reduces one of the biggest operational risks of the current PoC.

What is still missing

  • the live openclawtest runtime is still driven by direct patched OpenClaw runtime files
  • the runtime patches still need to be reduced and progressively replaced by cleaner repo-owned integration seams
  • callback behavior still needs more deterministic acceptance coverage in the live environment

Current judgment

The project now has:

  • design documents
  • PoC success proof
  • reusable core/store/policy/callback modules
  • OpenClaw bridge helpers
  • unit tests
  • reproducible apply/rollback patch scripts

That is enough to say the pluginization effort is materially underway, not just planned.