Auto-Next Obligation Gate

Purpose

This runbook defines the approved-plan continuity rule that a workflow may not stop at a completed-task boundary when the next task in the same approved plan is already known and continuation is still allowed.

When auto-next is obligatory

Auto-next is obligatory when all of the following are true:

  • the current workflow is inside the same approved plan
  • the current task is complete
  • the next task is known
  • the system is attempting a task-boundary stop instead of continuing execution
  • reply closure state is not waiting_user
  • reply closure state is not blocked
  • reply closure state is not pending_verification
  • highRiskStop is not active

In this state, the system must auto-dispatch the next task and record a real dispatch receipt. A dry-run planner result or stated intent to continue is not enough.

The following are legal non-auto-next closures even when a next task exists:

  • waiting_user
  • blocked
  • pending_verification

These states are the only normal closure states that can stop without auto-next dispatch.

Allowed non-closure exception

The following explicit exception may bypass auto-next obligation without using the normal legal terminal closure states:

  • highRiskStop

highRiskStop means the workflow is intentionally stopping at an explicit high-risk stop point and therefore does not have to auto-dispatch the next task yet.

Forbidden behavior

The following behavior is forbidden:

  • completed task
  • next task known
  • same approved plan
  • normal closeout or handoff language
  • no real dispatch receipt for the next task
  • no legal closure state
  • no highRiskStop

A completed task in the same approved plan must not end with “I can continue with the next task” style closeout unless the next task has actually been dispatched.

Canonical failure condition

If all of the following are true:

  • task is complete
  • next task is known
  • next task belongs to the same approved plan
  • the system is stopping at a task boundary
  • no valid dispatch receipt exists
  • closure is not waiting_user, blocked, or pending_verification
  • highRiskStop is false

Then the continuity gate must fail and treat the stop as an auto-next obligation violation.

Canonical failure table

Task complete Next task known Same approved plan Boundary stop Receipt Closure / exception Expected
yes yes yes yes no completed closure FAIL
yes yes yes yes valid receipt completed closure PASS
yes yes yes yes no waiting_user PASS
yes yes yes yes no blocked PASS
yes yes yes yes no pending_verification PASS
yes yes yes yes no highRiskStop PASS

Notes for implementation

  • The obligation applies only when the next task is known within the same approved plan.
  • A generic next action is not enough unless it proves the same approved plan task transition.
  • A real dispatch receipt remains the source of truth for whether auto-next actually happened.
  • This rule is intentionally minimal so it can later move into the continuity plugin without changing the behavior contract.